100% Original Factory Shuttering - 65 Steel Frame Formwork – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

Innovation, excellent and reliability are the core values of our firm. These principles today more than ever form the basis of our success as an internationally active mid-size corporation for Scaffold Board Retaining Clips, Film Faced Shuttering Plywood, Building Shuttering, We are now looking forward to even greater cooperation with overseas customers based on mutual benefits. If you are interested in any of our products, please feel free to contact us for more details.
100% Original Factory Shuttering - 65 Steel Frame Formwork – Lianggong Detail:

Product Details

111

This is framed modular formwork system

It is composed by Formwrok panel and Accessories.

Formwork Panel: Steel frame riveted 15mm plywood

Steel frame:  Q235B (GB/T700-2007)

Plywood: High quality hardwood or Eucalyptus film faced construction plywood with 15mm.

Permitted concrete pressure: 90 kN/㎡

The distance of adjusting hole is 50mm. It is minimum adjust increment.

Seal off the unused holes in the formwork sheet of the Universal panels with plugs R 20.

1 (1)
1 (2)
1 (3)
1 (4)

Our design though is SIMPLE IS BEST, Only 9 regular size formwork panel: 3000×1200; 3000×950; 3000×600; 1200×1200; 1200×950; 1200×600;

600×1200; 600×950; 600×600; (As following drawing)

2 (2)
2 (1)

Notice: The max working width of one single panel should be less 150mm than panel’s width.

  • The panel can be jointed to any height and width to fit actual requirement in jobsite.
  • The column dimension adjust method: (Section of column)

3

Shear wall solution

4 (2)
4 (3)
4 (1)
5
3
4
6 (2)
6 (3)
6 (1)

Fastener Accessories:

1.Column Coupler

Column coupler  is used for vertical connect two formwork panel, it’s composed by lock catch and disk nut.

1
2 (1)

Usage: Insert the lock catch’s rod to adjusting hole,

7 (2)
7 (1)

Change the position of column coupler by adjusting hole, then 4 formwork panel surrond area will be changed the dimension. To be suitable for different section size column applications.

2.Standard Clamp

Standard clamp is used for connect twoformwork panel to expand formwork area and height. It’s not only use for connect formwork panel, but also be used for connect ladder, caster, rebar regulator, this is multifunction design, in order to more convenience in jobsite.

1-128
1 (2)
8 (1)
8 (2)

3. Alignment coupler

11
1 (4)

Alignment coupler is used for connect two formwork panel, but also it has aligned function. It’s reinforcements of standard clamp in connection.

These accessories’ locking and unfasten use hammer is enough. Improve work efficiency, simplify working.

4. Ladder & Work Platform

22

Working access to monitored concrete pouring,the feature as follows:

Utilize normal steel pipe as handrail instead of design specially-made. Take full advantage of exactly materials in jobsite.

Use same fasten clamp (C-clamp) on handrail and metal plank, multifunction design.

Use same connection mode in formwork panel and ladder (by standard clamp). Let the ladder can be erect and move quickly.

Sketch of work platform:

11 (2)
12

Component:

3-1 : Standard

3-2 : Metal Plank

3-3 : C-Clamp

Handrail use normal steel pipe.

Permitted service load: 1.5 kN/㎡ (150kg/㎡)

Load Class 2 to EN 12811-1:2003

5. Wheel set (Caster)

111

Using bolts or clamp to connect on the formowrk panel, twist the handle, you can lift the formwork suite, easy to move, although the formwork is heavier, just 1 or 2 people can easily move it, from one work position to another quickly and flexible, needn’t setup formwork for every one column, meanwhile, reduce the cost of using of crane.Because it can be easily removed, one set is shareable for many formwork suite, save the cost.

In order to keep the formwork suite stable, safety and use convenience, it was designed 2 type. Usually use 2 rib-connect type and 1 side-connect type in half column formwork suite.

011 (1)

Side- connect

Connect by Standard clamp

011 (2)

Rib- connect

Connect by bolt

6.Crane hook

1111

Provide a lift point for formwork panel. Connect on the rib of formwork panel by bolt.

Used to secure the position of rebar to prevent dislocation. Use same shaped profile with formwork frame, easily to connect and dismantle by standard clamp.

11

7.Chamfer strip

4 (1)
4 (5)
4 (4)
4 (2)
4 (3)

8.pull-push prop

图片10

Shoring the formwork keep and adjust the angle of verticality.

Connect the formwork by bolt and fixed on the rib. Another end be fixed on the concrete harden surface by anchor bolt.

Some region have safety regulations on the corner of construction components, it cannot appear sharp angles.

The traditional method is to use a triangular section of wood to nail in the edges of the formwork.

This chamfer strip can be install on the side of formwork panel, need not nail to fix.

2 1 1. Internal cornerElastic corner let formowrk dismentle more easy with enough strength. 
1 (2) 1 (1) 2. No external corner designExternal corner is unnecessary, why need more accessories when we have good coupler design?
2 (1) 2 (2)  3. Articulated CornerSimilar to hinges, let any different angle forming is possible.
 2 1  4. Infill material connector
 4  3 5.  Infill clampFix narrow gap by infill materials quickly. Scope: 0~200mm
 1  1 (2) 6.Waler clampAlign all panel when integral lift and erection.
1  2 7. Single side supporterB-form for single-side wall up to 6m5
 3 4
11 (2) 11 (1) Supporter connector

Simple, convenience and safe connect supporter with formwork panel

Shear Wall assembly

1125

Shear Wall assembly

1

About surface panel:

The surface panel of B-form is 12mm film faced plywood. We know the plywood’s service life are limited, as usually, it can be used about 50 times in the B-form frame.

 That means you need change new plywood. Actually it’s very easy and convenience. Only 2 step: Rivet ;  Seal side

Blind rivet (5*20)

4

Silicone sealant

5
6
7

The rivet should be anchord to anchor plate. (A small triangle plate in frame)

About cutting size:

8

We know the standard plywood dimension is 1220x2440mm (4’ x 8’)

 B-form regular size has 3000mm length.  We can joint 2 panel.  The steel frame has bean prepared

“anchor plate”(small triangle as below photo).  Let joint on rib tube.

So, the 3m panel should be cut 2388mm + 587mm

Other dimension B-form panel can use integral plywood.

The plywood size should be shorter 23~25mm than B-form panel

Form example:

B-form 1200mm—-Plywood  1177mm

B-form 950mm—-Plywood  927mm

B-form 600mm—-Plywood  577mm

图片9


Product detail pictures:

100% Original Factory Shuttering - 65 Steel Frame Formwork – Lianggong detail pictures

100% Original Factory Shuttering - 65 Steel Frame Formwork – Lianggong detail pictures

100% Original Factory Shuttering - 65 Steel Frame Formwork – Lianggong detail pictures


Related Product Guide:

Bear "Customer initially, High-quality first" in mind, we work closely with our prospects and supply them with efficient and specialist companies for 100% Original Factory Shuttering - 65 Steel Frame Formwork – Lianggong , The product will supply to all over the world, such as: United Kingdom, Maldives, Seychelles, We honor ourselves as a company that comprises of a strong team of professionals who are innovative and well experienced in the international trading, business development and product advancement. Moreover, the company stays unique among its competitors due to its superior standard of quality in production, and its efficiency and flexibility in business support.
  • The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By Judy from Milan - 2018.10.09 19:07
    This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
    5 Stars By Mignon from Belgium - 2018.09.12 17:18
    Write your message here and send it to us