2021 High quality Tunnel Shuttering - Hydraulic Tunnel Linning Trolley – Lianggong
2021 High quality Tunnel Shuttering - Hydraulic Tunnel Linning Trolley – Lianggong Detail:
Product Details
Designed and developed by our own company, hydraulic tunnel lining trolley is an ideal system for formwork lining of railway and highway tunnels. Driven by electrical motors, it is able to move and walk by itself, with hydraulic cylinder and screw jack being used to position and retrieve the formwork. The trolley has many advantages in operation, such as low cost, reliable structure, convenient operation, fast lining speed and good tunnel surface.
The trolley is generally designed as a steel arch type, using a standard combined steel template, without automatic walking, using external power to drag, and the detachment template is all manually operated, which is labor-intensive. This type of lining trolley is generally used for short tunnel construction, especially for tunnel concrete lining construction with complex plane and space geometry, frequent process conversion, and strict process requirements. Its advantages are more obvious. The second tunnel reinforced concrete lining adopts a simple arch frame design, which solves these problems well, and at the same time, the engineering cost is low. Most of the simple trolleys use artificial concrete pouring, and the simple lining trolley is filled with concrete conveying pump trucks, so the rigidity of the trolley should be particularly strengthened. Some simple lining trolleys also use integral Steel Formwork, but they still use threaded rods and do not move automatically. This type of trolley is generally filled with concrete delivery pump trucks. Simple lining trolleys generally use combined steel formwork. Combined steel formwork is generally made of thin plates.
The rigidity of the steel formwork should be considered in the design process, so the spacing between steel arches should not be too large. If the length of the steel formwork is 1.5m, the average spacing between the steel arches should not be greater than 0.75m, and the longitudinal joint of the steel formwork should be set between the push and the push to facilitate the installation of formwork fasteners and formwork hooks. If the pump is used for infusion, the infusion speed should not be too fast, otherwise it will cause deformation of the composite steel formwork, especially when the lining thickness is greater than 500mm, the infusion speed should be slowed down. Be careful when capping and pouring. Pay attention to the pouring of concrete at all times to prevent the concrete pouring after filling, otherwise it will cause mold explosion or deformation of the trolley.
Structure diagram of hydraulic tunnel lining trolley
Technical parameters
01. Specifications: 6-12.5 m
02.Maximum lining length: L=12m (can be adjusted according to the customers)per unit
03.Maximum passing capacity: (height * width) construction does not affect the car at the same time
04.Crawling ability: 4%
05. Walking speed: 8m/min
06.Total power: 22.5KW Traveling motor 7.5KW*2=15KW oil pump motor 7.5KW
07.Pressure of hydraulic system:Pmqx=16Mpa
08.Unilateral modulus removal of formwork:Amin=150
09.Left and right adjustment of horizontal cylinder:Bmax=100mm
10.Lifting cylinder: 300mm
11.Maximum stroke of the cylinder: lateral cylinder 300mm
12. Horizontal cylinder: 250mm
Project application
Product detail pictures:
Related Product Guide:
To be the stage of realizing dreams of our employees! To build a happier, more united and more professional team! To reach a mutual benefit of our customers, suppliers, the society and ourselves for 2021 High quality Tunnel Shuttering - Hydraulic Tunnel Linning Trolley – Lianggong , The product will supply to all over the world, such as: Hamburg, Slovenia, New Delhi, We also provide OEM service that caters to your specific needs and requirements. With a strong team of experienced engineers in hose design and development, we value every opportunity to provide best products and solutions for our customers.
By Nicola from Kenya - 2018.06.19 10:42
It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
By Tyler Larson from Qatar - 2017.01.28 19:59