8 Year Exporter Pouring A Slab Foundation - Precast Steel Formwork – Lianggong
8 Year Exporter Pouring A Slab Foundation - Precast Steel Formwork – Lianggong Detail:
Product Details
Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.
The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.
Key componets
1. Casting yard and segment production(geometry control program and software)
2. Segment erection/ installation and equipments
Segment casting yard components
1. Short-line match casting and casting mould units
2. Production and working space
• rebar assembly
• prestressing work
• segment touch-up/ repair
• ready-mixed concrete plant
3. Lifting equipments
4. Storage area
Characteristics
1. Construction Simplicity
• Easier installation of external post-tensioned tendons
2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.
3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/ good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production
4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.
Packing
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Product detail pictures:
Related Product Guide:
Using a full scientific good quality administration system, very good quality and superior faith, we win good standing and occupied this discipline for 8 Year Exporter Pouring A Slab Foundation - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Belgium, The Swiss, Angola, We have constructed strong and long co-operation relationship with an enormous quantity of companies within this business in Kenya and overseas. Immediate and specialist after-sale service supplied by our consultant group has happy our buyers. Detailed Info and parameters from the merchandise will probably be sent to you for any thorough acknowledge. Free samples may be delivered and company check out to our corporation. n Kenya for negotiation is constantly welcome. Hope to get inquiries type you and construct a long-term co-operation partnership.
By Beatrice from Berlin - 2017.01.28 18:53
In general, we are satisfied with all aspects, cheap, high-quality, fast delivery and good procuct style, we will have follow-up cooperation!
By Diana from Puerto Rico - 2017.10.27 12:12