Precast girder formwork has advantages of high-precision, simple structure, retractile, easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.
The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.
Key componets
1. Casting yard and segment production(geometry control program and software).
2. Segment erection/ installation and equipments.
Segment casting yard components
1. Short-line match casting and casting mould units
2. Production and working space
• rebar assembly
• prestressing work
• segment touch-up/repair
• ready-mixed concrete plant
3. Lifting equipments
4. Storage area
Characteristics
1. Construction Simplicity
• Easier installation of external post-tensioned tendons
2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.
3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production
4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.
Packing
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Product detail pictures:
Related Product Guide:
With our excellent administration, strong technical capability and strict excellent control method, we carry on to offer our clients with responsible good quality, reasonable costs and great companies. We intention at becoming considered one of your most responsible partners and earning your pleasure for Bottom price Concrete Pour Back - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Berlin, Romania, Suriname, Since always, we adhering to the "open and fair, share to get, the pursuit of excellence, and creation of value"values, adhere to the"integrity and efficient, trade-oriented, best way , best valve" business philosophy. Together with our all over the world have branches and partners to develop new business areas, maximum common values. We sincerely welcome and together we share in global resources, opening up new career together with the chapter.
By Octavia from Melbourne - 2017.06.19 13:51
Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
By Rebecca from Latvia - 2018.05.13 17:00