Chinese Professional Front End Tie Rod Replacement - Tie Rod – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

We will constantly satisfy our respected customers with our good excellent, superior value and superior assistance due to we're additional experienced and far more hard-working and do it in cost-effective way for Tie Rod Forklift, Rcc Building House, lightweight trench box, We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
Chinese Professional Front End Tie Rod Replacement - Tie Rod – Lianggong Detail:

Product Details

Formwork tie rod performs as the most important member in tie rod system, fastening formwork panels. Usually used together with wing nut, waler plate, water stop, etc. Also it is enbeded in concrete used as lost part.

Tie rods are often used in steel structures, such as bridges, industrial buildings, tanks, towers, and cranes. In ships, tie rods are bolts which keep the whole engine structure under compression. They provide for fatigue strength. They also provide for proper running gear alignment which prevents fretting.

Concrete formwork tie rod can be in cold rolled and hot rolled.

Cold rolled tie rod is in steel grade S235 and S450.

Hot rolled tie rod is also called rebar in steel grade ST500 -1100. Hot rolled rebar popular steel grade is in ST 830, ST 930 ST1100 in concrete construction.

Formwork tie rod are used together with formwork tie nuts include anchor flange nut, wing nut with base plate, water stopper barriers, wedge clamp, Hex Nut, dome nut etc. Inner thread of the tie nuts must be matched up with the tie rod size thread screw.

The formwork tie rod size can be in D12-D50mm. The most popular size of tie rod no matter cold rolled or hot rolled, is in D15, D16, D17, D20, D22mm for construction slab, wall and beams

Formwork tie rod length is always in customized from 1m to 12mtr.

Concrete formwork tie rod can be in black or zinc-plated(whilte or yellow golden color) from wellmade scaffold, China leading OEM scaffolding formwork manufacturer, ISO&CE, 50,000m2 auto to 49 countries.

Lianggong formwork tie rod is one of the most important accessories in pouring shear wall project. Together with Lianggong big plate nut, concrete formwork tie rod and big plate nut act as wall tie system, to fasten the formwork panels tightly during concrete pouring process.  

Packing


3


4

Application


1 (1)


1 (3)


1 (4)


1 (2)


Product detail pictures:

Chinese Professional Front End Tie Rod Replacement - Tie Rod – Lianggong detail pictures

Chinese Professional Front End Tie Rod Replacement - Tie Rod – Lianggong detail pictures

Chinese Professional Front End Tie Rod Replacement - Tie Rod – Lianggong detail pictures

Chinese Professional Front End Tie Rod Replacement - Tie Rod – Lianggong detail pictures


Related Product Guide:

It can be a great way to enhance our solutions and service. Our mission would be to build inventive products to consumers with a superior working experience for Chinese Professional Front End Tie Rod Replacement - Tie Rod – Lianggong , The product will supply to all over the world, such as: European, Philadelphia, Bahrain, With high quality, reasonable price, on-time delivery and customized & personalized services to help customers achieve their goals successfully, our company has got praise in both domestic and foreign markets. Buyers are welcome to contact us.
  • The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
    5 Stars By Sharon from Dubai - 2018.08.12 12:27
    In our cooperated wholesalers, this company has the best quality and reasonable price, they are our first choice.
    5 Stars By Janice from kazan - 2017.03.28 16:34
    Write your message here and send it to us