Factory making Coffrage - 65 Steel Frame Formwork – Lianggong

Short Description:


Product Detail

Related Video

Feedback (2)

Assume full duty to satisfy all demands of our clients; reach steady advancements by marketing the development of our purchasers; grow to be the final permanent cooperative partner of clientele and maximize the interests of customers for Slip Form Formwork System, Aluminium Scaffold Tower, Patio Extension Contractors, Welcome any inquiry to our company. We will be glad to establish friendly business relationships with you!
Factory making Coffrage - 65 Steel Frame Formwork – Lianggong Detail:

Product Details

111

This is framed modular formwork system

It is composed by Formwrok panel and Accessories.

Formwork Panel: Steel frame riveted 15mm plywood

Steel frame:  Q235B (GB/T700-2007)

Plywood: High quality hardwood or Eucalyptus film faced construction plywood with 15mm.

Permitted concrete pressure: 90 kN/㎡

The distance of adjusting hole is 50mm. It is minimum adjust increment.

Seal off the unused holes in the formwork sheet of the Universal panels with plugs R 20.

1 (1)
1 (2)
1 (3)
1 (4)

Our design though is SIMPLE IS BEST, Only 9 regular size formwork panel: 3000×1200; 3000×950; 3000×600; 1200×1200; 1200×950; 1200×600;

600×1200; 600×950; 600×600; (As following drawing)

2 (2)
2 (1)

Notice: The max working width of one single panel should be less 150mm than panel’s width.

  • The panel can be jointed to any height and width to fit actual requirement in jobsite.
  • The column dimension adjust method: (Section of column)

3

Shear wall solution

4 (2)
4 (3)
4 (1)
5
3
4
6 (2)
6 (3)
6 (1)

Fastener Accessories:

1.Column Coupler

Column coupler  is used for vertical connect two formwork panel, it’s composed by lock catch and disk nut.

1
2 (1)

Usage: Insert the lock catch’s rod to adjusting hole,

7 (2)
7 (1)

Change the position of column coupler by adjusting hole, then 4 formwork panel surrond area will be changed the dimension. To be suitable for different section size column applications.

2.Standard Clamp

Standard clamp is used for connect twoformwork panel to expand formwork area and height. It’s not only use for connect formwork panel, but also be used for connect ladder, caster, rebar regulator, this is multifunction design, in order to more convenience in jobsite.

1-128
1 (2)
8 (1)
8 (2)

3. Alignment coupler

11
1 (4)

Alignment coupler is used for connect two formwork panel, but also it has aligned function. It’s reinforcements of standard clamp in connection.

These accessories’ locking and unfasten use hammer is enough. Improve work efficiency, simplify working.

4. Ladder & Work Platform

22

Working access to monitored concrete pouring,the feature as follows:

Utilize normal steel pipe as handrail instead of design specially-made. Take full advantage of exactly materials in jobsite.

Use same fasten clamp (C-clamp) on handrail and metal plank, multifunction design.

Use same connection mode in formwork panel and ladder (by standard clamp). Let the ladder can be erect and move quickly.

Sketch of work platform:

11 (2)
12

Component:

3-1 : Standard

3-2 : Metal Plank

3-3 : C-Clamp

Handrail use normal steel pipe.

Permitted service load: 1.5 kN/㎡ (150kg/㎡)

Load Class 2 to EN 12811-1:2003

5. Wheel set (Caster)

111

Using bolts or clamp to connect on the formowrk panel, twist the handle, you can lift the formwork suite, easy to move, although the formwork is heavier, just 1 or 2 people can easily move it, from one work position to another quickly and flexible, needn’t setup formwork for every one column, meanwhile, reduce the cost of using of crane.Because it can be easily removed, one set is shareable for many formwork suite, save the cost.

In order to keep the formwork suite stable, safety and use convenience, it was designed 2 type. Usually use 2 rib-connect type and 1 side-connect type in half column formwork suite.

011 (1)

Side- connect

Connect by Standard clamp

011 (2)

Rib- connect

Connect by bolt

6.Crane hook

1111

Provide a lift point for formwork panel. Connect on the rib of formwork panel by bolt.

Used to secure the position of rebar to prevent dislocation. Use same shaped profile with formwork frame, easily to connect and dismantle by standard clamp.

11

7.Chamfer strip

4 (1)
4 (5)
4 (4)
4 (2)
4 (3)

8.pull-push prop

图片10

Shoring the formwork keep and adjust the angle of verticality.

Connect the formwork by bolt and fixed on the rib. Another end be fixed on the concrete harden surface by anchor bolt.

Some region have safety regulations on the corner of construction components, it cannot appear sharp angles.

The traditional method is to use a triangular section of wood to nail in the edges of the formwork.

This chamfer strip can be install on the side of formwork panel, need not nail to fix.

2 1 1. Internal cornerElastic corner let formowrk dismentle more easy with enough strength. 
1 (2) 1 (1) 2. No external corner designExternal corner is unnecessary, why need more accessories when we have good coupler design?
2 (1) 2 (2)  3. Articulated CornerSimilar to hinges, let any different angle forming is possible.
 2 1  4. Infill material connector
 4  3 5.  Infill clampFix narrow gap by infill materials quickly. Scope: 0~200mm
 1  1 (2) 6.Waler clampAlign all panel when integral lift and erection.
1  2 7. Single side supporterB-form for single-side wall up to 6m5
 3 4
11 (2) 11 (1) Supporter connector

Simple, convenience and safe connect supporter with formwork panel

Shear Wall assembly

1125

Shear Wall assembly

1

About surface panel:

The surface panel of B-form is 12mm film faced plywood. We know the plywood’s service life are limited, as usually, it can be used about 50 times in the B-form frame.

 That means you need change new plywood. Actually it’s very easy and convenience. Only 2 step: Rivet ;  Seal side

Blind rivet (5*20)

4

Silicone sealant

5
6
7

The rivet should be anchord to anchor plate. (A small triangle plate in frame)

About cutting size:

8

We know the standard plywood dimension is 1220x2440mm (4’ x 8’)

 B-form regular size has 3000mm length.  We can joint 2 panel.  The steel frame has bean prepared

“anchor plate”(small triangle as below photo).  Let joint on rib tube.

So, the 3m panel should be cut 2388mm + 587mm

Other dimension B-form panel can use integral plywood.

The plywood size should be shorter 23~25mm than B-form panel

Form example:

B-form 1200mm—-Plywood  1177mm

B-form 950mm—-Plywood  927mm

B-form 600mm—-Plywood  577mm

图片9


Product detail pictures:

Factory making Coffrage - 65 Steel Frame Formwork – Lianggong detail pictures

Factory making Coffrage - 65 Steel Frame Formwork – Lianggong detail pictures

Factory making Coffrage - 65 Steel Frame Formwork – Lianggong detail pictures


Related Product Guide:

We pursue the management tenet of "Quality is remarkable, Company is supreme, Name is first", and will sincerely create and share success with all clientele for Factory making Coffrage - 65 Steel Frame Formwork – Lianggong , The product will supply to all over the world, such as: Las Vegas, Algeria, Philadelphia, We warmly welcome domestic and overseas customers to visit our company and have business talk. Our company always insists on the principle of "good quality, reasonable price, the first-class service". We are willing to build long-term, friendly and mutually beneficial cooperation with you.
  • The supplier cooperation attitude is very good, encountered various problems, always willing to cooperate with us, to us as the real God.
    5 Stars By Agnes from belarus - 2017.12.02 14:11
    This company conforms to the market requirement and joins in the market competition by its high quality product, this is an enterprise that have Chinese spirit.
    5 Stars By Louise from Sacramento - 2018.09.23 17:37
    Write your message here and send it to us