Hot-selling Making A Laminated Beam - H20 Timber Beam Column Formwork – Lianggong
Hot-selling Making A Laminated Beam - H20 Timber Beam Column Formwork – Lianggong Detail:
Product Details
The timber beam column formwork is mainly used for casting columns, and its structure and connecting way are quite similar to that of wall formwork.High flexibility with only a few main components can meet any construction requirements, such as timber beam H20, steel waling, plywood and clamp etc.
Material | Q235 Steel, Timber Beam, Plywood |
Color | Customized Or Yellow,Blue,Brown |
Size | Universal Forming |
Technical Specification
Max. permissable pressure is 80kN/m2
Easy to take any fresh concrete pressure by adjusting layout space between H20 and walers
Max.Cross section is 1.0mx1.0m without in-through tie rod
Flexible adjustment to fit different column dimension
Timber beam adjustable column formwork
The adjustable column formwork enables concrete casting of square or rectangular columns within a specific range by adjusting the size of the formwork section area. The adjustment is realized by changing the relative position of the walers.
There are three specifications for the walers of adjustable column formwork, which can do concrete casting of square or rectangular columns with side length of 200-1400mm. Sizes of column to be casted as follows:
Length of waler (m) |
Scope of side length of column to be casted (m) |
1.6 and 1.9 |
1.0 ~ 1.4 |
1.6 and 1.3 |
0.6 ~ 1.0 |
1.3 and 0.9 |
0.2 ~ 0.6 |
It can be adjusted to any cross-section size within the allowable range, both square and rectangular. The schematic diagram of adjustment is as follows:
Wall diagonal brace
The timber beam wall column formwork needs to be equipped with a spindle strut, which is used as an adjusting system as shown in the figure:
Application
Our Service
Provide support in every stage of projects
1. Provide cosult when client take part in projects bid invitation.
2. Provide optimized formwork tender solution to assitant client to win the project.
3. Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
4. Start to design the formwork detailedly according to the winning bidding.
5. Provide economic formwork solution package and provide continous on-site support service.
Packing
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
—bundles: timber beam, steel props, tie rod, etc.
—pallet: small parts will be put in bags and then on pallets.
—wooden cases: it is available on customer’s request.
—bulk: some irregular goods will be loaded in bulk in container.
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Product detail pictures:
Related Product Guide:
Our advantages are lessen charges,dynamic income team,specialized QC,sturdy factories,premium quality services for Hot-selling Making A Laminated Beam - H20 Timber Beam Column Formwork – Lianggong , The product will supply to all over the world, such as: Mauritius, Uzbekistan, Jordan, We care about every steps of our services, from factory selection, product development & design, price negotiation, inspection, shipping to aftermarket. We have implemented a strict and complete quality control system, which ensures that each product can meet quality requirements of customers. Besides, all of our products have been strictly inspected before shipment. Your Success, Our Glory: Our aim is to help customers realize their goals. We are making great efforts to achieve this win-win situation and sincerely welcome you to join us.
By Roxanne from Kazakhstan - 2017.09.30 16:36
Company director has very rich management experience and strict attitude, sales staff are warm and cheerful, technical staff are professional and responsible,so we have no worry about product,a nice manufacturer.
By Linda from moldova - 2017.03.28 16:34