Newly Arrival Jump Formwork System - Cantilever Climbing Formwork – Lianggong
Newly Arrival Jump Formwork System - Cantilever Climbing Formwork – Lianggong Detail:
Product Details
The cantilever climbing formwork, CB-180 and CB-240, are mainly used for large-area concrete pouring, such as for dams, piers, anchors, retaining walls, tunnels and basements. The lateral pressure of concrete is borne by anchors and wall-through tie rods, so that no other reinforcement is needed for the formwork. It is featured by its simple and quick operation, wide range adjustment for one-off casting height, smooth concrete surface, and economy and durability.
The cantilever formwork CB-240 has lifting units in two types: diagonal brace type and truss type. Truss type is more suitable for the cases with heavier construction load, higher formwork erection and smaller scope of inclination.
The main difference between CB-180 and CB-240 is the main brackets. The width of main platform of these two systems is 180 cm and 240 cm respectively.
Characteristics of CB180
● Economical and safe anchoring
The M30/D20 climbing cones have been designed especially for single-sided concreting using CB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.
● Stable and cost-effective for high loads
generous bracket spacings allow large-area formwork units with optimal utilization of the bearing capacity. This leads to extremely economical solutions.
● Simple and flexible planning
With CB180 single-sided climbing formwork, circular structures can also be concreted without undergoing any large planning process. Even use on inclined walls is feasible without any special measures because additional concrete loads or lifting forces can be safely transferred into the structure.
Characteristics of CB240
● High bearing capacity
The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.
● Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.
● Fast striking process without a cran
With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.
● Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.
Product detail pictures:
Related Product Guide:
We not only will try our greatest to offer you excellent services to just about every client, but also are ready to receive any suggestion offered by our buyers for Newly Arrival Jump Formwork System - Cantilever Climbing Formwork – Lianggong , The product will supply to all over the world, such as: Orlando, Slovakia, Bandung, We welcome you to visit our company, factory and our showroom displayed various products that will meet your expectation, meanwhile, it is convenient to visit our website, our sales staff will try their efforts to provide you the best service. If you need more information, please do not hesitate to contact us by E-mail or telephone.
By Jessie from Mexico - 2017.03.28 12:22
The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
By Marcy Real from Japan - 2018.06.30 17:29