Well-designed Poured Concrete Foundation - Precast Steel Formwork – Lianggong
Well-designed Poured Concrete Foundation - Precast Steel Formwork – Lianggong Detail:
Product Details
Precast girder formwork has advantages of high-precision, simple structure, retractile, easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.
The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.
Key componets
1. Casting yard and segment production(geometry control program and software).
2. Segment erection/ installation and equipments.
Segment casting yard components
1. Short-line match casting and casting mould units
2. Production and working space
• rebar assembly
• prestressing work
• segment touch-up/repair
• ready-mixed concrete plant
3. Lifting equipments
4. Storage area
Characteristics
1. Construction Simplicity
• Easier installation of external post-tensioned tendons
2. Time Savings/Cost Effectiveness
• Precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• By using efficient erection method and equipment, the rapid installation of viaduct can be achieved.
3. Quality Control Q – A/QC
• Precast segment to be produced in factory-manner condition w/good quality control.
• Minimum interruption natural impacts such as bad weather, rain.
• Minimum waste of material
• Good precision in production
4. Inspection and Maintenance
• External prestressing tendons can be easily inspected and repaired if required.
• Maintenance program can be scheduled.
Packing
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
—Bundles: timber beam, steel props, tie rod, etc.
—Pallet: small parts will be put in bags and then on pallets.
—Wooden cases: it is available on customer’s request.
—Bulk: some irregular goods will be loaded in bulk in container.
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer’s down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Product detail pictures:
Related Product Guide:
"Quality very first, Honesty as base, Sincere assistance and mutual profit" is our idea, in an effort to create consistently and pursue the excellence for Well-designed Poured Concrete Foundation - Precast Steel Formwork – Lianggong , The product will supply to all over the world, such as: Senegal, Mali, Hamburg, The company attaches great importance to product quality and service quality, based on the business philosophy "good with people, genuine to whole world, your satisfaction is our pursuit". we design products, According to customer's sample and requirements, to meet the needs of the market and offer different customers with personalized service. Our company warmly welcomes friends at home and abroad to visit, to discuss cooperation and seek common development!
By Eleanore from San Francisco - 2018.06.05 13:10
This company conforms to the market requirement and joins in the market competition by its high quality product, this is an enterprise that have Chinese spirit.
By Victor from Angola - 2017.11.01 17:04